Pricing Contractor Jobsite Overhead Delay Costs

Duration: 90 minutes Speaker: James G. Zack, Jr.

Available On-Demand

PURCHASE OPTIONS

Individual Purchase Options
On-Demand
Available On-Demand. Watch the webinar recording multiple times for 30 days.
$189
Recording
Download link will be emailed for single user access with handouts. Available in 3-5 business days, after Live Event. Never Expires.
$219
Transcript (PDF)
PDF transcript of webinar with handouts will be emailed. Available in 7-10 business days, after Live Event. Never Expires.
$179
ABOUT THE EVENT

When contractors encounter owner-caused (excusable/compensable) delays they are typically entitled under the contract to recover both the time resulting from the delay as well as delay damages. Idled equipment/labor and material escalation costs are reasonably easy to calculate in such situations. Typically, contractors also seek to recover their delay costs (extended field office overhead or general conditions costs) also. Calculating this cost is more complex than dealing with delayed direct costs. There are, at least, eight methods of calculating extended field office overhead costs. None of the calculations arrive at the same daily delay cost. This webinar by industry expert James G. Zack, Jr., discusses all eight methods – offering commentary on the strong and weak points of each. The paper also offers recommendations on how project owners can resolve this dilemma in advance of delays, thus making the issue less contentious should a contractor encounter an owner-caused delay.

Why Should You Attend

After attending this webinar you will have a better understanding of the issues concerning the pricing of contractor delay damages. Contractors will gain knowledge about the various methods of calculating extended field office overhead costs. Owners will learn some contractual methods for predetermining this element of delay costs in order to prevent the need for the end of the job audits or disputes over such costs.

Learning Objectives

  • Learn about the recoverability of extended field office overhead costs in the event compensable delay arises on a project.
  • General Contractors will gain information on the various accepted methods of calculating this element of delay damages.
  • Owners will be exposed to various methods of specifying this element of delay damages in contracts in order to avoid disputes, later on, should a compensable delay occur.
  • Owners and contractors will receive information on what costs should be deducted from this element of delay damages prior to the submittal of costs in a claim.
  • Owners will gain insight into the issue of the contractor’s obligation to mitigate damages in the event of the owner caused delay.

Areas Covered

  • In this webinar attendees will learn about the recoverability of extended field office overhead costs, including what field office overhead is and the typical elements of this cost.
  • Attendees will be exposed to the basics of calculating extended field office overhead costs.
  • The webinar will discuss the various actual cost methods for calculating extended field office overhead.
  • The webinar will explore the various total cost methods of calculating extended field office overhead costs.
  • The webinar will discuss how the jury verdict method may be used to make this delay damage calculation.
  • Attendees will learn how stipulated contract methods concerning field office overhead may be employed.
  • The webinar will identify what costs must be deducted from the submission of field office overhead costs by the contractor.
  • The contractor’s obligation to mitigate damages will also be discussed.

Who Should Attend

  • Owners & Contractor Project Managers
  • Resident Engineers & Architects
  • Agency Construction Managers
  • Construction Managers@Risk
  • Design Managers
  • Legal Counsel representing project participants
0725ea90b67e376c7601b255702a7ea7.jpg
James G. Zack, Jr.

Jim is the Principal, James Zack Consulting, LLC. Formerly Senior Adviser, Ankura Construction Forum™, Executive Director, Navigant Construction Forum™, and previously Executive Director, Corporate Claims Management Group, Fluor Corporation. Prior to this, Vice President of PinnacleOne and Executive Director of the PinnacleOne Institute and earlier a Senior Construction Claims Consultant for CH2M HILL. For more than 49 years, he has prepared and submitted claims for contractors or analyzed and resolved or defended claims for both public and private owners in 36 states in the U.S. and 39 countries abroad. He is a Fellow of AACE, the Royal Institution of Chartered Surveyors, the Guild of Project Controls, and the Society of Construction Claims Specialists. In the construction claims field, he is a recognized and published expert in mitigation, analysis and resolution or defense of construction claims and disputes. Jim has authored or co-authored 125 articles, papers, or book chapters related to the many aspects of construction claims. He is a Certified Construction Manager, a Certified Forensic Claims Consultant, an Expert Certified Construction Claims Specialist, an Expert Certified Construction Delay Analyst, and a Project Management Professional.

Access Unlimited Webinars

SUBSCRIBE NOW
Why You Should Subscribe?
Unlimited Live and On-Demand Courses

Watch all live or recorded webinars (up to 120 minutes long). Get instant access to a library of more than 500 high quality courses presented by best-in-class presenters.

CEUs: APA, CPE, SHRM and HRCI Credits

Fulfil your recertification requirements by earning CEUs from APA, CPE, SHRM and HRCI.

Free Access to Course Materials

Each program comes with Additional Course Materials, which you can download and read anytime.

Additional Discounts

Get flat 20% discount on Premium Product Category like, Long Hour Webinars.

Call Now At

888-527-3477


Subjects: Construction

Testimonials

What people are saying about us


Loretha

Client

It was a well done presentation. I like how everything that was shown to us helps us to be more organized and productive.


Azahara

Client

Gave samples and took their time to explain everything to the point


Katie

Client

I learned the different levels of violations. Her experience is very evident. As long as I can retain the information, I will be on top of my game.


Steve

Client

Learning the importance of REAC due to I am a new Property Manager this is very helpful.


Lucious Cameron

Client

The subject matter was very interesting and the instructor was well informed. Content of the webinar was Very Helpful!


Daniel

Client

I finally understand how the effective date of actions affects discrepancies.

Get Unlimited Webinars, Starting $799 only!
  • Unlimited Live and On-Demand Webinars (Up to 120 Minutes Long)
  • Unlimited Course Materials
  • CEUs: APA, CPE, SHRM and HRCI
  • 20% Discount on Long Hour Webinars
  • Certificate of Participation
Choose Membership

Similar Events

https://www.complianceprime.com/uploads/img_upload/1707319698_f5a2d403ae4a8919f7d1.jpg
https://www.complianceprime.com/uploads/img_upload/1690210566_ddeafec58b7fab473c74.png

Oct 13th 2021 @ 01:00 PM ET

Overtime: California Style for 2021
https://www.complianceprime.com/uploads/img_upload/267e8433fc9abd9f1289ffe10c593e2e.jpg

May 14th 2019 @ 01:00 PM ET

Understanding Differing Site Conditions
Event Calendar

Our Accreditation Partner